Cooling tower maintenance is the most important steps for the cooling tower operation.  The routine maintenance work is as follows:


1. Cleaning the cooling tower fill;

2. Checking the spraying system;

3. Checking the water basin and float system;

4. Fastener inspection;

5. Motor maintenance;

6. Reducer maintenance

7. Fan cleaning;

8. Belt adjustment;

9. Paint anti-rust paint;


After the above steps when cooling tower operation, it could improve the cooling effiency and increase the usage life for cooling towers.

Recently, TJLATINO had several ongoing projects for cooling tower installation and maintenace in China.

Project 1: Cooling tower maintenance for power plant, main work is change and repair the cooling tower distribution pipe and some cooling tower nozzle and cooling tower fill if damage.

Cooling tower

Project 2: Leak repair for ACC 

ACC

Project 3:  New FRP cooling tower installation from TJLATINO

Cooling tower services

TJLATINO can supply the followings:

1, whole set cooling towers;

2, cooling tower part, such as cooling tower fill, cooling tower spraying system, cooling tower structure, fan stack, etc.;

3, cooling tower services, such as cooling tower repair, cooling tower maintenance, cooling tower installation, cooling tower design,etc.

Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.