- Home
- >
News
The Liangchi cooling tower fill is one of Latino's major cross flow cooling tower fills. This liangchi cooling tower fill is distingguish into A and B on the surface, which is different for gluing Point. The distance between two pieces are 19-20mm more or less. The thickness are 0.27mm to 0.38mm, the length and the width is fixed. There are 4 sizes per piece: 750mm*800mm/piece,750mm*1600mm/piece,1000mm*1200mm/piece and 375mm*800mm/piece.
The cooling tower nozzle structure allows avoiding the formation of non-irrigated zones in the spray flame and achieving fine-dispersed sprinkling of water in the cooling tower, while the direct-flow shape of the cooling tower nozzle significantly reduces the likelihood of its being clogged with the admixtures in the water.
This Cooling Tower ABS Spray Nozzle is one of three-splashed nozzles, which are made from ABS material. This spray nozzle is made by disposable injection molding, so it is suitable for the hydraulic load and can satify the needs of long-term safe operation of water distribution system. It could distribute the water to the cooling tower fill uniformly by using the cross water distribution method, without the hollow phenomenon.
We completed the cooling tower replacement and maintance in Ruiwan Hotel ,yrsterday they went to our warehouse assemble the cooling tower drift eliminator.
The Cooling Tower Replacement and Maintance in Ruiwan hotel. We spent three days to complete the maintenance of the entire tower, thank you very much for our workers.
Fiber reinforced plastic (FRP), also known as fiber reinforced polymer, is in fact a composite material constituting a polymer matrix blended with certain reinforcing materials, such as fibers. The fibers are generally basalt, carbon, glass or aramid; in certain cases asbestos, wood or paper can also be used.
Since the nCov-19 , lots of factories still can not work, we are faced with great production pressure. In order to increase the production capacity, we have put in a new PVC Fill Film production line, which has been put into operation successfully yesterday. This will greatly improve our production capacity and ensure that every export orders can be shipped on time