Subway cooling tower maintenance

Cooling tower packing should be replaced irregularly after 4 years of use to ensure the normal work efficiency of the cooling tower, the number of years has been aging, some of the filler has fallen off, resulting in a decrease in the heat transfer capacity of the cooling tower. Affects the operating efficiency of the refrigeration unit and consumes a lot of energy.

At the same time, the crushed cooling tower filler enters the condenser copper pipe of the unit with the operation of the cooling water pump, and the new cooling water treatment agent currently used by our department has a strong function of peeling off the rust, resulting in the blockage of the copper pipe of the condenser of the unit. In the operation of the cooling tower, if it is found that there is an uneven phenomenon of water distribution, it should be tried to eliminate the cause in time, generally due to the blockage of the water pipe and the shedding of the sprinkler.



Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.