News

NEW COOLING TOWER PP FILL

New cooling tower PP fill is widly used in the cooling tower industry.

2021/03/05
READ MORE
Steel Structure Cooling Tower Pre-assemble Before Shipment

Latino will pre-assemble all the cooling towers before shipment to avoid any inconveniences for endusers.

2020/11/03
READ MORE
Second Batch-PP Net Fill

Second Batch-PP Net Fill, 2958.82 m3 , 10*40HQ dispatch yesterday, loading from morning to night , which will be 10 cells of Cooling Tower PP net Fill Size : 900* 450mm Pitch : 19mm Weight : 0.2 KG Material : PP Suitable : Dirty Water and High Temperature

2020/07/29
READ MORE
One 40 HC to Indonesia for the Mellaring

Latino finished the 50 m³ Mellaring for Indonesia with in 15 days.

2019/04/02
READ MORE
Prev 1 2
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.