News

Electrolyte cooling tower maintenance project

With the global warming and the production efficiency improvement, the original designed cooling tower can not satisfy the designed technical data and high efficency production anymore. So most of cooling towers need to been improved and maintenanced. These projects usually begin from the spring.

2020/04/08
READ MORE
Regarding to the Coronavirus

Since December 2019, a novel coronavirus pneumonia has appeared in Wuhan City Hubei. Province, spread quickly in other Chinese cities and foreign countries have also found. Through the epidemic situation in China has been under control, it keeps increasing in foreign countries.

2020/03/18
READ MORE
Congratulations Latino!

Congratulations and BRAVO! Latino get a single order for 10000 m3 cooling tower Fill.

2020/03/16
READ MORE
The status quo of Chinese society under Corona virus spreading

As an international trade practitioner, i have sincerely explain to each of my customer our current status . We do not need to whitewash or conceal anything , because we have done our best to do a good job . We Latino was got the approve from government , and product safely and arrange the shipment for lots of orders

2020/03/07
READ MORE
Keeping Working to Arrange the Shipment during Virus Situation

When the container left the workshop with full of cooling tower fill and nozzles , feeling is mixed , during this special period, we still can be shipped the goods on time . It relay on the government support and everyone's effort . We are not afraid of the risk of virus, do a good job in safety protection, ensure production and catch up with orders. We Latino keep working , and supply one stop service for cooling tower parts, every inquiries and order can be reply and deal with on time. Welcome to inquiries to us as before

2020/02/25
READ MORE
Supply one Stop Service of Cooling Tower and Parts.

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .

2020/01/20
READ MORE
Cooling Tower MC75 PVC Fills

MC75—a film fill system designed for counterflow towers offering you several distinct advantages.

2020/01/20
READ MORE
Cooling Tower Drift Eliminator Pack

This drift eliminator were installed by the sinusoidal wave blade and wave spacer. This drift eliminator were widely used in the top of the counterflow and crossflow cooling tower, and its function is to separate the droplets in the airflow.

2019/12/30
READ MORE
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.