Cooling Tower Fill Pack

S wave corrugated PVC cooling tower fill is the most widely used cooling tower fill. Due to its big space design, and S wave shape, The fills have excellent cooling efficiency and good performance in processing the dirty water, especially the processing water contains solid impurities.
The "S" wave cooling tower fill packs made by PVC or PP material, thermal forming by mold and plastic forming machine. Sheet thickness and color can be customized. All these advantages makes its become the ideal infill for counter flow industrial cooling tower, Power plant heave duty cooling tower,ewage treatment cooling tower and so on.

  • LATINO
  • China
  • within 2 weeks
  • 500 m3/day
  • Information
  • Video
  • Download

Cooling Tower Fill  Pack


Production Specification


Cooling Tower Pvc Fills pack consists of thermoformed corrugated sheets made of rigid polyvinyl chloride (PVC), impervious to decay, fungus and biological attack. The cooling tower fill sheets are bonded to form modules which can be dimensioned to fit any application.

 

Cooling tower PVC fill combines properties related to a media’s ability to allow substances to migrate through it, while maintaining thermal efficiency— this then allows for the use of cooling tower film fill where fouling risks occur.


“S” wave water cooling tower fill packing make full use of the reasonable design principle of the trapezoidal oblique wave, at the same time increase the number of water film closure, make water film repeatedly redistribution and tend to be more uniform. Increase vertical rib stop wave, improve water film lateral diffusion ability, can make the moisture in the packing more fully for heat and mass transfer, at the same time make the water film or slow speed, extend the time for heat and mass transfer, improve the cooling effect.

Cooling tower fill

cooling tower replacement

Cooling tower parts

Cooling tower PVC fill pack is one of the most important components for the cooling tower. It's major parts is to add the contacting area for the air and water to improve the cooling effect.


Advantage for the fill pack: durable, good performance, small ventilated resistance.


This cooling tower fill pack is widely used in different types of the cooling tower. For more informations, please kindly contact us.


Related Cooling Tower Fill:


Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

Latino has a high quality team of talents. Team members are young and energetic, with a sense of innovation and the courage to meet the challenge.Team members develop and practice new e-marketing mode, follow consumer demand, provide customers with high quality products and services.

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .
 
Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.


Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs。






Brand Strength
10 years cooling tower project revisiting from Latino
Factory and Main Facilities
Factory and Main Facilities
Test Lab and quality control process
Test Lab and quality control process
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.