PP/PVC Lamella Clarifier/Inclined Tube Settler for Wastewater Treatment

This PP/PVC Lamella Clarifier/Inclined Tube Settler for Wastewater Treatment is used in deposition and discharging sand. Recently, it is very popular in the drain aging project.
With widely applicability, high efficiency, small proportion, PP/PVC Lamella Clarifier/Inclined Tube Settler for Wastewater Treatment is very suitable not only in discharge, deposition of water from daily life and industry isolation of oil, but also in the project which is being constructing, re-construction of project.

  • LATINO
  • CHINA
  • 2 WEEKS
  • 10000 SQUARE METER ONE DAY
  • Information
  • Video
  • Download

PP/PVC Lamella Clarifier/Inclined Tube Settler for Wastewater Treatment

  

PP/PVC Lamella Clarifier/Inclined Tube Settler for Wastewater Treatment is a system used for clarification. It uses multiple tubular channels sloped at an angle of 60° and adjacent to each other, which combine to form an increased effective settling area. It captures the settleable fine floc that escapes the clarification zone beneath the tube settlers and allows the larger floc to travel to the tank bottom in a more settleable form. The tube settler’s channel collects solids into a compact mass which promotes the solids to slide down the tube channel.


SIGNIFICANCE:

1. Clarifiers/basins equipped with tube settlers can operate at 2 to 4 times the normal rate of clarifiers/basins without tube settlers.

2. New installations using tube settlers can be designed smaller because of increased flow capability.

3. Flow of existing water treatment plants can be increased through the addition of tube settlers.

4. Tube settlers increase allowable flow capacity by expanding settling capacity and increasing the solids removal rate in settling tanks.

Technical Data For PP/PVC Lamella Clarifier/Inclined Tube Settler for Wastewater Treatment:


MaterialStandard       Block Size    (mm)Hole Size     (mm)
Angle of         Inclination(℃)Thickness    (mm)Kgs
PP1000*1000*1000
30
60
0.40-0.5019-27
350.40-0.5519-25
50
0.50-0.60
14-24
PVC300.40-0.5024-40
350.40-0.5021-36
500.50-0.6019-28
FRP800.40-0.5025-28
500.45-0.6020-22
800.60-0.8022-25

Relevant Cooling Tower Fill:

tube settler

  

Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

  

Latino has a high quality team of talents. Team members are young and energetic, with a sense of innovation and the courage to meet the challenge.Team members develop and practice new e-marketing mode, follow consumer demand, provide customers with high quality products and services.

  

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers; Latino's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .

  

Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.

  

Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs!

Brand Strength
10 years cooling tower project revisiting from Latino
Factory and Main Facilities
Factory and Main Facilities
Production Equipment
Production Equipment
Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.